Legal Disclaimer

This website is owned and operated by Aris Mining Corporation. Where we say “we”, “us”, “our”, “the Company”, or “Aris Mining”, we mean Aris Mining Corporation and/or one or more of all of its affiliates, as may be applicable. By using this website, you agree to the following terms and conditions.

TERMS OF USE

Currency of website

Aris Mining updates the information on this website regularly. However, such information is not intended to be a comprehensive review of all matters and developments concerning Aris Mining, and Aris Mining cannot guarantee the accuracy, currency or completeness of the information at all times and assumes no responsibility in this regard.

Copyright and Trademarks

Certain material found on this website is protected by copyright. Certain names, graphics, logos, icons, designs, words, titles or phrases on this website may constitute trade names, trademarks or service marks of Aris Mining or other entities. Trademarks may be registered in Canada and in other countries, as applicable. The display of trademarks on pages at this website does not imply that a license of any kind has been granted. Except for non-commercial, personal or educational purposes, where the material is not modified and that copyright or trademark notices are not deleted, materials may not be copied, reproduced, modified, uploaded, posted, transmitted, or distributed in any way without Aris Mining’s prior written approval. Any unauthorized downloading, re-transmission or other copying or modification of trademarks and/or the contents herein may be a violation of federal or common law, trademark and/or copyright laws and could subject the copier to legal action.

Other materials on this website not originally produced by us are copyrighted by their respective creators/owners and appear here either by permission, example or as public domain reference material.

Privacy Policy

Aris Mining is committed to controlling the collection, use and disclosure of personal information. If you have any concerns relating to the privacy or confidentiality of this website, please contact Aris Mining’s Privacy Officer at info@aris-mining.com

Disclaimer

THE INFORMATION AND MATERIALS CONTAINED IN THIS WEBSITE ARE PROVIDED “AS IS” WITHOUT ANY EXPRESS OR IMPLIED WARRANTY OF ANY KIND, INCLUDING WARRANTIES OF MERCHANTABILITY, NON-INFRINGEMENT OF INTELLECTUAL PROPERTY, OR FITNESS FOR ANY PARTICULAR PURPOSE. IN NO EVENT SHALL ARIS MINING BE LIABLE FOR ANY DAMAGES WHATSOEVER (INCLUDING, WITHOUT LIMITATION, DAMAGES DUE TO LOSS OF PROFITS OR BUSINESS INTERRUPTION) OR DUE TO THE USE OF OR INABILITY TO USE THE MATERIALS.

In using this website, you agree that Aris Mining shall not be liable for any damages whatsoever (including indirect, incidental, special, punitive or consequential damages and loss of profits, opportunities or information) arising from (a) your use of or reliance on information contained on this website; (b) any inaccuracy or omission in such information or failure to keep the information current; (c) use of any third party websites linked or referred to in this website; (d) any delays, inaccuracies or errors in, or in the transmission of, any stock price quotes or historical price data; (e) any Internet software used in connection with this website or computer viruses or other destructive programs encountered as a result of using this website; and (f) any other matter connected with the website; even if Aris Mining is made aware of the possibility of such claims, damages or losses.

Although considerable care has been taken in preparing and maintaining the information and materials contained on this website, they are provided on an “as is” basis, without warranty of any kind, either express or implied, with respect to the accuracy or completeness of the information. Unless otherwise indicated, all information posted on this website is current only as of the date of the document that contains the information, if indicated, or the date on which the document is posted, whichever is earlier. Aris Mining may at any time make changes to the information at this website without prior notice. You should always ensure that you are referring to the most current information available on this website.

Aris Mining Not Responsible for Linked websites

In this website, Aris Mining has provided links and references to several other websites for your convenience only and the inclusion of these links does not imply that Aris Mining monitors or endorses these websites. Aris Mining has no control over information at sites hyperlinked or referred to in this website. These links and references are being provided for the convenience of the users of this website and Aris Mining does not endorse and is not responsible or liable for the content, nature or reliability of any linked or referenced website or any link contained in a linked or referenced website. Aris Mining takes no responsibility for monitoring, updating, supplementing or correcting any information on any linked or referenced website and makes no representation or warranties regarding such information. Please be aware that in linking or going to these outside websites, you are leaving the Aris Mining website and that Aris Mining is not responsible for the content of any other site.

Cautionary Statement on Forward Looking Information

This website contains certain “forward-looking statements” and “forward-looking information” under applicable Canadian securities laws concerning the business, operations and financial performance and condition of Aris Mining Gold Corporation. Forward-looking statements and forward-looking information include, but are not limited to, statements with respect to:

  • business plans and strategies of Aris Mining;
  • operating or technical difficulties in connection with mining or development activities;
  • availability and costs associated with mining inputs and labour;
  • the speculative nature of mineral exploration and development;
  • diminishing quantities or grades of reserves;
  • risk of unusual or unexpected formations, cave-ins, flooding, etc., and the risk of inadequate insurance to cover such risks;
  • synergies and financial impact of completed acquisitions;
  • the benefits of the acquisitions and the development potential of properties of Aris Mining;
  • the future price of gold and silver;
  • supply and demand for gold and silver;
  • the estimation of reserves;
  • the realization of reserve estimates;
  • costs of production and projections of costs;
  • success of exploration activities;
  • capital expenditure programs and the timing and method of financing thereof;
  • the ability of Aris Mining to achieve mining success consistent with management’s expectations;
  • net present values of future net revenues from reserves;
  • expected levels of royalty rates, operating costs, general and administrative costs, costs of services and other costs and expenses;
  • expectations regarding the ability to raise capital and to add to reserves through acquisitions;
  • assessments of the value of acquisitions and exploration and development programs;
  • geological, technical, drilling and processing problems;
  • changes in national and local government legislation, taxation, controls, regulations and political or economic developments in Canada, Colombia, or other countries in which Aris Mining does or may carry on business in the future; and
  • treatment under governmental regulatory regimes and tax laws.

All statements other than statements of historical fact are forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as “anticipate”, “believe”, “could”, “estimate”, “expect”, “forecast”, “guidance”, “intend”, “may”, “plan”, “predict”, “project”, “should”, “target”, “will”, or similar words suggesting future outcomes or language suggesting an outlook. By their very nature, forward-looking statements involve inherent risks and uncertainties (both general and specific). Forward-looking statements are based on the opinions and estimates of management at the date the statements are made, as well as a number of assumptions made by, and information currently available to the Corporation concerning, among other things, anticipated geological, mine and financial performance, business prospects, strategies, regulatory developments, future commodity prices, future production levels of the Corporation’s assets, the ability to obtain financing on acceptable terms, the ability to add production and reserves through acquisition, development and exploration activities and that there will be no significant events occurring outside of Aris Mining’s normal course of business. Although management considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect.

Many of these assumptions are based on factors and events that are not within the control of Aris Mining and there is no assurance they will prove to be correct. Factors that could cause actual results to vary materially from results anticipated by such forward-looking statements include changes in market conditions, risks relating to international operations, fluctuating gold prices and currency exchange rates, changes in project parameters, the possibility of project cost overruns or unanticipated costs and expenses, labour disputes and other risks of the mining industry, failure of site, equipment or processes to operate as anticipated, acquisitions not being integrated successfully or such integration proving more difficult, time consuming or costly than expected, as well as those risk factors discussed or referred to in Aris Mining’s public filings with the securities regulatory authorities in the provinces of Canada and available at www.sedarplus.ca. Although Aris Mining has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended.

Aris Mining undertakes no obligation to update forward-looking statements if circumstances or management’s estimates or opinions should change except as required by applicable securities laws. Statements relating to “reserves” are deemed to be forward-looking statements, as they involve the implied assessment, based on certain estimates and assumptions, that the reserves described exist in the quantities predicted or estimated and can be profitably produced in the future.

Undue reliance should not be placed on forward-looking statements, which are inherently uncertain, are based on estimates and assumptions, and are subject to known and unknown risks and uncertainties (both general and specific) that contribute to the possibility that the future events or circumstances contemplated by the forward-looking statements will not occur. There can be no assurance that the plans, intentions or expectations upon which forward-looking statements are based will in fact be realized. Actual results will differ, and the difference may be material and adverse to the Corporation and its shareholders.

Stock, Warrants and Notes Quotes

All quotes are delayed at least 20 minutes unless otherwise stated. All quotes and historical price data are provided by third party service providers and are provided for informational purposes only, and are not intended for trading purposes. If you are contemplating trading in the securities of Aris Mining, we strongly advise you to seek independent professional advice before making any investment decision.

Aris Mining makes no representation or warranty regarding the accuracy or completeness of any such stock, warrant or notes price quotes or historical stock, warrant or notes price data and has not taken any steps to verify, the adequacy, accuracy or completeness of the information provided herein and, under no circumstances, will be liable for any inaccuracies or omissions in any such information or data, any delays or errors in the transmission thereof, or any loss or direct, indirect, incidental, special or consequential damages caused by reliance on this information or the risks arising from the stock market.

Website is Provided as a Service Only

This website is not intended as a solicitation or offering of securities in any jurisdiction and the information contained herein in no way should be construed or interpreted as such. No securities commission or other regulatory authority in Canada or any other country or jurisdiction has in any way passed upon this information and no representation or warrant is made by Aris Mining to that effect. The information on this website is not intended to modify, qualify, supplement or amend information disclosed under corporate and securities legislation of any jurisdiction applicable to Aris Mining and should not be used for the purpose of making investment decisions concerning Aris Mining’s securities. Investors and potential investors should refer to Aris Mining’s SEDAR+ profile at www.sedarplus.ca.

Qualified Person

The technical information of this website was reviewed and approved by Pamela De Mark, P.Geo, Senior Vice President, Geology and Exploration of Aris Mining, who is a Qualified Person as defined by NI 43-101.

Technical information

Measured and Indicated mineral resources are reported inclusive of mineral reserves. Mineral resources and reserves are as defined by the Canadian Institute of Mining, Metallurgy, and Petroleum's 2014 Definition Standards for Mineral Resources & Mineral Reserves. Mineral resources are not mineral reserves and have no demonstrated economic viability. There are no known legal, political, environmental, or other risks that could materially affect the potential development of the mineral resources.

The mineral resource and reserve estimates were prepared following the Canadian Institute of Mining, Metallurgy, and Petroleum's Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines. Each of the Qualified Persons responsible for the preparation of the mineral resources have reviewed and verified the drilling, sampling, assaying, and QAQC protocols and results, and are of the opinion that the sample recovery, preparation, analyses, and security protocols are reliable for the mineral resource and reserve estimates.

Technical reports for Marmato, Soto Norte, Segovia, Toroparu, and Juby have been filed with the Canadian securities regulatory authorities and are available for review on Aris Mining’s website at www.aris-mining.com.

Scientific and technical information concerning Marmato is summarized, derived, or extracted from the Marmato Technical Report entitled "Revised NI 43-101 Technical Report Pre-Feasibility Study Marmato Project Colombia" dated September 18, 2020 with an effective date of March 17, 2020. The Marmato Technical Report was prepared by Ben Parsons, MSc, MAusIMM (CP), Eric J. Olin, MSc Metallurgy, MBA, SME-RM, MAusIMM, Fernando Rodrigues, BS Mining, MBA, MAusIMM, MMSAQP, Jeff Osborn, BEng Mining, MMSAQP, Joanna Poeck, BEng Mining, SME-RM, MMSAQP, Fredy Henriquez, MS Eng, SME, ISRM, Breese Burnley, P.E., Cristian A Pereira Farias, SME-RM, David Hoekstra, BS, PE, NCEES, SME-RM, David Bird, PG, SME-RM, Mark Allan Willow, MSc, CEM, SME-RM, and Tommaso Roberto Raponi, P.Eng, each of whom is independent of Aris Mining within the meaning of NI 43-101 and is a "Qualified Person" as such term is defined in NI 43-101.

Scientific and technical information concerning Soto Norte is summarized, derived, or extracted from the Soto Norte Technical Report entitled "NI 43-101 Technical Report Feasibility Study of the Soto Norte Gold Project, Santander, Colombia", dated March 21, 2022 with an effective date of January 1, 2021. The Soto Norte Technical Report was prepared by Ben Parsons, MSc, MAusIMM (CP), Chris Bray, BEng, MAusIMM (CP), Dr John Willis PhD, BE (MET), MAusIMM (CP), and Dr Henri Sangam, Ph.D., P.Eng., each of whom is independent of Aris Mining within the meaning of NI 43-101 and is a "Qualified Person" as such term is defined in NI 43-101. The report was also prepared by Robert Anderson, P.Eng., a Qualified Person who is considered non-independent of Aris Mining.

Scientific and technical information concerning Segovia is summarized, derived, or extracted from the Segovia Technical Report entitled "NI 43-101 Technical Report, Prefeasibility Study, Segovia Project, Antioquia, Colombia" dated May 6, 2022 with an effective date of December 31, 2021. The Segovia Technical Report was prepared by Ben Parsons, MSc, MAusIMM (CP), Eric Olin, MSc, MBA, MAusIMM, SME-RM, Cristian A. Pereira Farias, SME-RM, David Bird, MSc, PG, SME-RM, Fredy Henriques, MS Eng, SME, ISRM, Jeff Osborn, BEng Mining, MMSAQP, Fernando Rodrigues, BS Mining, MBA, MAusIMM, MMSAQP, Giovanny Ortiz, BS Geology, FAusIMM, Joshua Sames, PE, BEng Civil, Mark Allan Willow, MSc, CEM, SME-RM, and Jeff Parshley, P.G., each of whom is independent of Aris Mining within the meaning of NI 43-101 and is a "Qualified Person" as such term is defined in NI 43-101.

Scientific and technical information concerning Toroparu is summarized, derived, or extracted from the Toroparu Technical Report entitled "Revised NI 43-101 Technical Report and Preliminary Economic Assessment for the Toroparu Gold Project, Upper Puruni River Region of Western Guyana" dated February 4, 2022 with an effective date of December 1, 2021. The Toroparu Technical Report was prepared by Glen Kuntz, P. Geo., Brian Wissent, P.Eng, Daniel Yang, P.Eng, Ben Peacock, P.Eng, Kurt Boyko, P.Eng, Fernando Rodrigues, MMSAQP, and David Willms, P.Eng, each of whom is independent of Aris Mining within the meaning of NI 43-101 and is a "Qualified Person" as such term is defined in NI 43-101. The Preliminary Economic Assessment is preliminary in nature and is based on numerous assumptions and includes inferred mineral resources. The inferred mineral resources are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves and there is no certainty that the Preliminary Economic Assessment will be realized.

Scientific and technical information concerning Juby is summarized, derived, or extracted from the Juby Technical Report entitled "Technical Report on the Updated Mineral Resource Estimate for the Juby Gold Project, Tyrrell Township, Shining Tree Area, Ontario" dated October 5, 2020 with an effective date of July 14, 2020. The Juby Technical Report was prepared by Joe Campbell, B.Sc., P.Geo., Alan Sexton, M.Sc., P.Geo., Duncan Studd, M.Sc., P.Geo. and Allan Armitage, Ph.D., P.Geo., each of whom is independent of Aris Mining within the meaning of NI 43-101 and is a "Qualified Person" as such term is defined in NI 43-101.